Project Description:
These egress systems were installed in a 10" thick, cast-in-place, concrete foundation.
We used our mini excavator to create the hole for one well and the other well we had to
dig by hand because of the proximity of the utilities. We saw cut the rough openings in the
concrete. The drains were installed and lead to the sump pump. We installed the windows
and the wells. Then, we backfilled with stone and finished with a layer of top soil.