Data Center Design Consulting Services
PTS Data Center Consulting Services are an enterprise-wide, consultative approach
to help you manage mission critical environments. The services encompass the entire
lifecycle, from assessment, strategy and design, to implementation and operational services.
We have the expertise, proven methodologies and tools to help you manage your data
center investments, improve operations and performance, and deliver business results.
PTS Data Center Consulting Services include:
Data Center Feasibility Studies Project Cost Budgeting
Data center project feasibility cost budgeting is accomplished by applying Key Design
Criteria to the two (2) main categories of the budget, the Technology Infrastructure & Services
(IT) and the Support Infrastructure & Services (the Facility). Our consulting team can help you
generate this data.
Data Center Availability & Risk Assessment
A comprehensive data center inspection to assess the ability of the support infrastructure to
provide continuous availability including a site inspection, an evaluation of the present load
condition, a comparison to the capacity constraints, identification of critical deficiencies and
potential downtime risks, an assessment of the concurrent maintenance capacity of the site
and expert consulting regarding recommendations for improvements.
Data Center Power & Cooling Systems Analysis
PTS load studies offer piece-of-mind when it comes to power equipment selection. As
part of our data center consulting services, our expert technician can provide complete load
profiling and reporting from simple spot-checking to week-long data logging. Our methodology
combines the business and technology expertise needed to ensure customer satisfaction from
concept through completion.
Data Center Project Owners Representation
Are you an IT professional that has been asked to provide your management team with the
size requirements, power requirements and cooling requirements of an up coming computer
room relocation? Are you overwhelmed by the array of choices when it comes to selecting the
ideal support, IT & cable infrastructure for your project? Are you concerned your team is
not equally represented when attending management, architect, engineering or construction
meetings? If so, PTS can provide you with a data center design professional that will doggedly
represent your best interests.
Data Center Technology Master Format Planning
Today's construction industry is a different place from where it was even just ten years ago.
The world around has advanced by leaps and bounds, and the construction industry has had to
follow suit. Today's business facilities are so much more than just walls, electric power and light,
plumbing and HVAC. Today's business facilities incorporate all of these things and so much more.
From redundant power supplies, 24x7 backup facilities, and multiple environment control
systems; to complete building control and automation systems, and miles of communications
cabling, today's business facilities are complex environments. Not only are the buildings themselves
more complex, but also the means and methods by which they are constructed. As such, the
organization, engineering, and teamwork required to construct them correctly and on-time are
just as complex. Our data center consulting services can stream-line and simplify the process for you.
Data Center Site Selection
PTS's consulting experts can provide an analysis of proposed data center site locations
including creating conceptual drawings and establishing budgets for the development of the
site. We also maintain a database of data center properties in the U.S., which can be used to
significantly shorten our clients' site search cost and time investment.
Business Continuity & Disaster Recovery
Business continuity is vital to business success. It can no longer remain the concern of the
IT department alone. How do you determine the continuity and recovery requirements of your
business? How do you identify and integrate critical business and IT priorities into a comprehensive
continuity program? Where do you start?
Data Center Relocation Evaluation & Planning
It is essential to have the IT equipment migration project team assembled and organized
early in the design process. As construction drawings are completed and the construction begins,
the team should be very hard at work with equipment planning and migration activities. Let our
data center consulting team guide you through this phase.
To speak with a PTS Data Center Solutions representative, please complete the